Payment  Administration  Chinese  English
About us | News | Products | Service | Equipment | Jobs | Contact us
Product search
Product classification
Cold drawn steel
Cold drawn steel
Cold drawn steel
冷拉六角钢
Cold drawn steel
Cold drawn steel
Carbon structural stee..
High quality carbon st..
High strength low allo..
Free cutting steel
Alloy structural steel
Bearing steel
Seamless pipe
Domestic stainless steel
Stainless steel
Stainless iron
Domestic copper
Domestic copper
Imports of copper
Imports of copper
Import special steel
Other optimal steel
Alloy tool steel
Spring steel
Gear steel
Alloy structural steel
Quality carbon steel
Cutting Steel
Imports of stainless steel
German series
Japan sus series
 Contact us
 Method of payment
 Technical service
 Machining center
 Personnel recruitment
Home  >  Import special steel  >  Other optimal steel
Product Details
Product Name: M202 --- Pre-hardened plastic mold steel
Product Type: M202 --- Pre-hardened plastic mold steel
Product Brand: Assab quality tool steel
On a: k460-- high wear-resistant chromium steel toughness
Under a: W400-- magnesium alloy tool steel
Product Description  

M202 --- Pre-hardened plastic mold steel
Chemical composition:


C carbon chromium Cr
  W tungsten
  Mn Manganese
  Si Si
  V V
 
0.95
  0.5
  0.5
  1.1
  0.3
  0.1
 

Steel Features:
This steel has been heat-treated, uniform hardness, up 278-311HB, 29-33HRC, made ​​mold will never change, excellent cutting and polishing performance for electrical erosion operation, can be used for flame hardened, chrome plated and nitriding.
Factory specifications: Pre-hardened to 950-1050N / mm2 (29-33HRC).
Purpose: all size plastic molds, and can be used for tin, lead, zinc alloy die-casting mold of the mold base.
Forged: 1050-850 ℃ furnace cooling.
Back to the matter: 850-900 ℃ furnace cooling.
Stress relief: After the heat evenly, stay cool in the oven for 1-2 hours.
Quenching: oil 840-860 ℃ or air: 860-880 ℃. Stay for at least 10 minutes, and the thickness of 20mm, see more than half minutes per 1mm, so that hardness of about 54HRC.
Tempering: tempering stay at least 1 hour, 20mm thick and more than 20mm each will have more than one hour

Related products  
Japan, Datong SK3, SK5
Suzhou aluminum factory price of 25 yuan..
NM400 wear-resistant steel
NM360 wear-resistant steel
Post a comment
*Name: 
Sex: 
*Phone: 
*E-mail: 
Properties: Public Private Message (Message Administrator only visible)
留言表情: 微笑 害羞 大哭 尴尬 调皮 呲牙 难过 偷笑
可爱 饥饿 困 疑问 晕 拥抱 玫瑰 爱心
凋谢 心碎 飞吻 礼物 强 弱 握手 胜利
留言标题: 
*Content:
(300 words)
 
  
·Open the invoice
·Shipping and logistics deliver..
·The settlement of payment
·Warehouse delivery
·The deposit fee
·The signing of the contract
·Suzhou area
·Express delivery
·The cod
·Logistics and transport
·Come from
·Data transfer
·Company transfer
·Agricultural Bank of Chi..
·Industrial and Commercia..
·Construction Bank Chines..
·China CITIC Bank
·Dispute settlement
·Ritong metal
·Customer information
·Ordering information
·How to handle the return
·Instructions

Copyright:Suzhou Ritong Metal materials Co., Ltd   Address:Suzhou city Wuzhong District Pu Zhuang Zhen and Ann West Road No. 1238 (Pu Yang Road)
Tel:0512-66379463 662592901338218313 Wang Manager   Customer service:0512-67681069   Technical support:TZ-NET.CN

  • 服务热线:
     13382183133