Payment  Administration  Chinese  English
About us | News | Products | Service | Equipment | Jobs | Contact us
News
News
Industry News
Technical service
Latest News
Product search
Product classification
Cold drawn steel
Cold drawn steel
Cold drawn steel
冷拉六角钢
Cold drawn steel
Cold drawn steel
Carbon structural stee..
High quality carbon st..
High strength low allo..
Free cutting steel
Alloy structural steel
Bearing steel
Seamless pipe
Domestic stainless steel
Stainless steel
Stainless iron
Domestic copper
Domestic copper
Imports of copper
Imports of copper
Import special steel
Other optimal steel
Alloy tool steel
Spring steel
Gear steel
Alloy structural steel
Quality carbon steel
Cutting Steel
Imports of stainless steel
German series
Japan sus series
 Contact us
 Method of payment
 Technical service
 Machining center
 Personnel recruitment
Home  >  Latest News
Latest News
Cold drawn steel heat treatment process
Source:Suzhou Ritong Metal materials Co., Ltd  Popularity:4534  Published:2013-08-08

Drawing concept: to save steel, steel for the purpose of improving the yield strength, with more than the yield strength and less than the ultimate strength tensile stress tensile steel, the plastic deformation of the practice thatdrawing.

In 1 the first cold effect:

A reinforced applied tensile stress of the steel bar cold drawn, deformation will occur (and stress -- strain diagram).With the increase of steel tensile stress, tensile stress increases. When the steel internal stresses exceed the yield point of the reinforcement with A, to C, to stop cold, remove the load. This time we can see, steel has plastic deformation, in the unloading process, stress -- strain map to have a change, linear O1C slower than line OA.

2 second cold effect:

Re applied tensile stress, the reinforcing bar tension to failure, changes in stress -- strain diagram appears new,near the yield point of the new points in the C, significantly higher than the original yield point A. This change shows that, changes of plastic steel, plastic small, high hardness, the strength of the reinforcing bar is improved, thisphenomenon is called "deformation hardening".

After more than two times of cold drawn steel (rebar) completed.

Cold drawing control on different situations:

1) cold stress control:

For the reinforced II, III, IV grade steel and 5 steel, in the cold, for prestressed reinforced use, must use cold stress control. But after cold drawing steel after inspection, the maximum tension rate exceeds the standard value (Table 3-- 1), and then to the mechanical experiment.

2) drawing rate measurement control requirements:

Control drawing to cold pull rate, control values to be determined by the test. Requirements: the same test furnace by the same batch of specimen, not less than 4, each specimen by the rules and regulations of cold stress determination corresponding cold pull rate, and take the average of the specimen as the actual drawing the furnacethe reinforcement ratio. If the strength of steel, cold high, average rate of less than 1%, in the cold drawn steel, are still on the 1% cold pull rate control.

3) cold drawing control different heats:

For hybrid, confuse reinforced, batch of cold drawn, cannot use cold pull rate control, but also to drawing a plurality of connection, each cold pull rate and the control stress must conform to the rules and regulations (3 -- 1).

4) cold drawing speed control:

To make steel fully deformation, we should properly control the cold drawing speed, generally 0.5 -- 1 is appropriate.At the same time, cold drawn to the specified shall force and cold draw ratio, then pulled up the 2 -- 3, and then relax the steel, cold drawn steel end, to give sufficient deformation time.

5) cold drawing control method:

Cold drawn only when tension rate or cold stress control called the single control, during cold drawn and cold stress at the same time application, called the dual control. Using a single control, simple and convenient construction. But for the reinforced material is not uniform, not by the root test (one test, labour and material consuming, not possible to do so, some with a reinforced cold pull rate are not the same) drawing quality can not be guaranteed. Double control method can avoid these problems. Cold, to control the stress has been reached, cold pull rate did not exceed the allowable value, can be considered qualified. However, if the tension rate has been reached, and cold stress is not up to the control stress, this kind of steel to reduce the intensity of use. For prestressed must adopt the double control method.

 On a:苏州日同关于2015年劳动休假通知
 Under a:Nonferrous Metals Industry 18 profit of the emergence of signs of improvement
Post a comment
*Name: 
Sex: 
*Phone: 
*E-mail: 
Properties: Public Private Message (Message Administrator only visible)
留言表情: 微笑 害羞 大哭 尴尬 调皮 呲牙 难过 偷笑
可爱 饥饿 困 疑问 晕 拥抱 玫瑰 爱心
凋谢 心碎 飞吻 礼物 强 弱 握手 胜利
留言标题: 
*Content:
(300 words)
 
  
·Open the invoice
·Shipping and logistics deliver..
·The settlement of payment
·Warehouse delivery
·The deposit fee
·The signing of the contract
·Suzhou area
·Express delivery
·The cod
·Logistics and transport
·Come from
·Data transfer
·Company transfer
·Agricultural Bank of Chi..
·Industrial and Commercia..
·Construction Bank Chines..
·China CITIC Bank
·Dispute settlement
·Ritong metal
·Customer information
·Ordering information
·How to handle the return
·Instructions

Copyright:Suzhou Ritong Metal materials Co., Ltd   Address:Suzhou city Wuzhong District Pu Zhuang Zhen and Ann West Road No. 1238 (Pu Yang Road)
Tel:0512-66379463 662592901338218313 Wang Manager   Customer service:0512-67681069   Technical support:TZ-NET.CN

  • 服务热线:
     13382183133